Some very pertinent details being reported by Inside Housing magazine, as summarised by The Guardian (https://www.theguardian.com/media/2...ine-that-warned-of-high-rise-fire-risks#img-1)
Grenfell Tower had not been checked for fire safety for 18 months, data released by Kensington and Chelsea Council under the Freedom of Information (FOI) Act shows.

The last fire risk assessment for the building, which went up in flames in the early hours of this morning, took place in December 2015.

This is believed to be shortly after a major refurbishment project which involved the addition of aluminium external wall cladding commenced, but before it completed. Eyewitnesses have said this cladding burned during the fire, contributing to the spread of the blaze.

The refurbishment also involved the temporary removal of fire protections from between the floors of the building.
http://m.insidehousing.co.uk/7020461.article?mobilesite=enabled

The organisation managing Grenfell Tower appointed a company to carry out its fire risk assessments at the “most competitive price” in 2010, board papers reveal.

The papers, which detail of board meetings of the Kensington and Chelsea Tenant Management Organisation (KCTMO), show the organisation settled on a consultancy which “was willing to challenge the fire brigade on our behalf if he considered their requirements to be excessive”.
http://m.insidehousing.co.uk/7020510.article?mobilesite=enabled
 
If Germany supposedly banned this cladding why was the rest of Europe still using it. European community quite happy to standardise carrot sizes and shapes but comes to something critical and affecting lives , seemingly nothing.
Could be 100 dead. Total disaster of events
EU can only regulate what the component countries are willing to regulate.
 
The air gap has to be there for the rainscreen panels to work. It expels moisture back out through the horizontal joints in the panels. If the insulation is fixed back to the structure then it will have a membrane on its external face for further damp protection. The panels may be either single skin or double with insulation sandwiched between. There should be fire stopping at every floor level across the whole cavity and tightly wedged, this should be sealed with fire foam. If the system is fitted correctly there is no funnel or chimney or vacuum effect. All panels should have a class 0 flame spread finish.
thank you, that sounds like someone who really knows.
 
If Germany supposedly banned this cladding why was the rest of Europe still using it. European community quite happy to standardise carrot sizes and shapes but comes to something critical and affecting lives , seemingly nothing.
Could be 100 dead. Total disaster of events
It's only like red bull is banned in France (or was) but not in the U.K. or Germany.

If it's dangerous for the French then surely is dangerous for everyone?
 
thank you, that sounds like someone who really knows.
I've not read every page but is the "gap created a chimney effect" now discernibly true or just repeated because the talking head mentioned that it can happen during the early morning coverage?
 
If Germany supposedly banned this cladding why was the rest of Europe still using it. European community quite happy to standardise carrot sizes and shapes but comes to something critical and affecting lives , seemingly nothing.
Could be 100 dead. Total disaster of events

Are you blaming this on the EU? Sorry but despite the public perception that the EU has been controlling every single aspect of our lives, this was clearly something we could have and should have dealt with domestically. No doubt if the EU had banned it there would've been complaints in the industry about unnecessary EU regulations anyway. We can't have it both ways.
 
For a few years, I was on the board of a community housing trust which also undertook a major refurbishment programme. Improving the appearence of buildings was definitely an objective of the programme, although by no means the main one. The accepted view was that improving the appearence of the buildings would make them more appealing to residents and potential residents, increase occupancy rates, reduce vandalism etc. There weren't any wealthy properties near our flats and houses so obviously I can't comment on whether that had a disproportionate influence on the Grenfell Tower refurbishment.
The cladding isn't about aesthetics, its about improving living conditions, these buildings went up in the 50/60/70's, and were often dreadfully built places, with little or no insulation, and leaked and/or suffered dreadful condensation/damp, often with no central heating. The cladding is added to improve the water proofing of the building, as well as the insulation, making them cheaper to heat for residents, and getting rid of the damp they often suffered from, if the aesthetics can be improved then all the better.

Yes landlords will have tried to make them cheaper to do, but what might be more important here is - was the cladding fitted in accordance with the instructions ? From what I understand, there has to be a gap between the concrete and the building, to prevent condensation/damp being a continuing issue, but there should be something to prevent fire spreading, if this is missing, then the immediate FB investigation will find that, and proper blame can be apportioned.

So was it fitted in accordance with the manufacturers instructions ? If so then did it meet the current safety regulations, if the answer is yes, then are the manufacturers instructions and/or the safety regulations fit for purpose ? These questions need to be answered quickly, because many many other buildings might be affected, and so thousands of other people are possibly at risk of a similar tragedy.
 
I've not read every page but is the "gap created a chimney effect" now discernibly true or just repeated because the talking head mentioned that it can happen during the early morning coverage?
If the fire stopping is in place on the slab levels there can be no chimney. Also rainscreen cladding has open horizontal joints which would expel smoke and the whole wall construction is capped at the top. Have designed many on both new and refurbished towers,,! Our whole office spent the last few days checking our specs for buildings going back 10 years....whatever happened here, will hit construction hard....although IMO the regs are sound. Procurement and building practice will be shaken down.
 
It's only like red bull is banned in France (or was) but not in the U.K. or Germany.

If it's dangerous for the French then surely is dangerous for everyone?

By that very same thought process, you would think that everybody would like to know how much sugar/ carbs etc., are in our foods, yet not every country takes up the option or has the belief.

You can see how governments decide its people's fate.
 
The cladding isn't about aesthetics, its about improving living conditions, these buildings went up in the 50/60/70's, and were often dreadfully built places, with little or no insulation, and leaked and/or suffered dreadful condensation/damp, often with no central heating. The cladding is added to improve the water proofing of the building, as well as the insulation, making them cheaper to heat for residents, and getting rid of the damp they often suffered from, if the aesthetics can be improved then all the better.

Yes landlords will have tried to make them cheaper to do, but what might be more important here is - was the cladding fitted in accordance with the instructions ? From what I understand, there has to be a gap between the concrete and the building, to prevent condensation/damp being a continuing issue, but there should be something to prevent fire spreading, if this is missing, then the immediate FB investigation will find that, and proper blame can be apportioned.

So was it fitted in accordance with the manufacturers instructions ? If so then did it meet the current safety regulations, if the answer is yes, then are the manufacturers instructions and/or the safety regulations fit for purpose ? These questions need to be answered quickly, because many many other buildings might be affected, and so thousands of other people are possibly at risk of a similar tragedy.
Spot on mate.
The internal fire spread was just as alarming though. As a 70,s tower I would have expected some asbestos spray coats to communal slab areas...maybe it was removed?
However something went horribly wrong with the stair and core protection and strategy...
 