Etihad Campus, Stadium and Collar Site Development Thread

Status
Not open for further replies.
Reminder how it would look as an expanded two tiered stand.

Id love it if they called it the 93:20 Stand and had a big '93:20' written into the tier with white seats.

image.png


Personally have a feeling it will just be a copy of the South Stand though. Mostly because the stand has to be developed under the constraints of the original cable net and the rake of the current 2nd tier might not line up with the old supports at the back.

The old net comes in at the new South Stand right at the very top between the seating and roof. So the tier size and rake had to be aligned up perfectly to allow that to happen.

Could they not build the 2nd tier so that it comes out a bit more at the front over the top of the first tier, in order to fit it inside the roof at the correct angle ?
 
Reminder how it would look as an expanded two tiered stand.

Id love it if they called it the 93:20 Stand and had a big '93:20' written into the tier with white seats.



Personally have a feeling it will just be a copy of the South Stand though. Mostly because the stand has to be developed under the constraints of the original cable net and the rake of the current 2nd tier might not line up with the old supports at the back.

The old net comes in at the new South Stand right at the very top between the seating and roof. So the tier size and rake had to be aligned up perfectly to allow that to happen.
Wouldn't you loose capacity doing it like that as level 3 wouldn't over hang level 2 or would the rake of the seats take up the short fall and could you keep the north stand open as the current level 2 would be the front of the new stand or would have to come out to get the rake right for the new seats ?@worsleyweb
 
Here's what I mean when I say any new development has to be built around the old cable net.

It would literally have been impossible to have built the new South Stand any bigger. It's at the exact height the old South Stand roof allows and these supports cannot be removed because the old cable net forms a loop which supports the roof on the other three sides.

The pics show where it comes in at the back and into the inside of the stadium where it would have supported the old roof.

image.png

image.jpg


If they go for one big 2nd tier they will have to build it around this problem.

It's possible but like has been said, it might not be able to hold as many seats as the South Stand third tier, unless they reduced the leg room between rows.

Don't think they would touch the current part of the 2nd tier either. They would just build from the back and connect them when the old roof came off in the final summer.
 
Here's what I mean when I say any new development has to be built around the old cable net.

It would literally have been impossible to have built the new South Stand any bigger. It's at the exact height the old South Stand roof allows and these supports cannot be removed because the old cable net forms a loop which supports the roof on the other three sides.

The pics show where it comes in at the back and into the inside of the stadium where it would have supported the old roof.

image.png

image.jpg


If they go for one big 2nd tier they will have to build it around this problem.

It's possible but like has been said, it might not be able to hold as many seats as the South Stand third tier, unless they reduced the leg room between rows.

Don't think they would touch the current part of the 2nd tier either. They would just build from the back and connect them when the old roof came off in the final summer.
,
Don't think they could match both the second and third tiers looking at this as the rake is completely different also if the idea is to marry the east and west stand ends to the south and north stand in the final 76k phase they can't alter the rake of the third tier else it won't join.
 
,
Don't think they could match both the second and third tiers looking at this as the rake is completely different also if the idea is to marry the east and west stand ends to the south and north stand in the final 76k phase they can't alter the rake of the third tier else it won't join.

They can't do that anyway because the rake of the 3rd tier sides is completely different to the new South third tier.
 
Reminder how it would look as an expanded two tiered stand.

Id love it if they called it the 93:20 Stand and had a big '93:20' written into the tier with white seats.

image.png


Personally have a feeling it will just be a copy of the South Stand though. Mostly because the stand has to be developed under the constraints of the original cable net and the rake of the current 2nd tier might not line up with the old supports at the back.

The old net comes in at the new South Stand right at the very top between the seating and roof. So the tier size and rake had to be aligned up perfectly to allow that to happen.

please let that happen ! it looks amazing and would give our stands more character.
 
St peters Sq tram line re-opened. Or due to re-open. Should improve service to Etihad.
 
Status
Not open for further replies.

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.