North Stand Construction Discussion



Glad we have the commentary from CP. Some decent footage here but completely ignores the stand being joined up, work on the towers etc.
 
Last edited:
I’m guessing the 2 x cranes planted in the hotel will probably come down before end of year at this rate?
What do the experts think?
 
I’m guessing the 2 x cranes planted in the hotel will probably come down before end of year at this rate?
What do the experts think?
Think the tower cranes will remain until each wing is “water tight “ ie roof finished and all facades in placed and fully glazed and “sails “fitted so not by Xmas ☹️
 
These tripody supports but with four legs instead, on top of the towers that will hold the new roof and cables up, and have the rooftop walk and platforms between them. More of a descriptive than a technical term, really.

View attachment 135330

With the big screen on the front face of the hotel does that not mean there will be quite a few rooms without a window?

Also is the rake of the new terrace steeper than the existing L2? Looks like it from that image and would be much better if so.
 