North Stand Construction Discussion

Only 30-35% of the building is office space.

30% is the museum, and 30-35% commercial and retail space.

The first two levels are commercial space, and I imagine from the way it is laid out would/could be almost independent of the club. Similar to how across the square will have individual f&b units.

The 3rd floor is retail, and as it is the only floor that connects to the stand, I think that's where the club shop will be, although it may well tie in with at least one of the units on the floor below with the voids introduced.

The next two floors up are the museum, and then the last floors are the office.

So not as much as the building makes you think from how it appears from the outside or in the drone videos.
Ground and first floor is City Store, Third is Museum and Fourth is the new VR / AR / MR experience the rest is for let office space

F&B for City Square is lower floor of the hotel building and at the back of the squareImage 8-4-25 at 12.51 PM.pngImage 8-4-25 at 12.49 PM.png
 
Last edited:
Ignore the descriptions. You know all of that. I did it for the SSC-MCR - North stand expansion thread.

One of the cable roof supports.

PXL-20250803-141918944-MP-2.jpg


Restricted view of the East stand from NSL3. But not the pitch

PXL-20250803-141857864-MP-2.jpg


View from the East stand

PXL-20250803-141825391-MP-2.jpg


View from the Tunnel Club seats. Colin Bell stand.

PXL-20250803-143421061-MP-2.jpg
 
I’m sure it’s been asked what is the timescale now for the north stand are we looking at January February for completion,and what of the museum and club shop and so on with timescale,finally are we looking at the hotel to be ready for the following season say august 2026 or is that to soon..
 
Ground and first floor is City Store, Third is Museum and Fourth is the new VR / AR / MR experience the rest is for let office space

F&B for City Square is lower floor of the hotel building
Not according to the latest amendment to the planning approval, which added the 3rd floor as retail, and shifted everything up a level, losing a floor of office.

But happy to take your word for it, seen you mention you ve heard more from people involved. I'm sure they can arrange all that and be flexible within the approval.

Overall point still stands, the offices are a smaller portion (circa a third) of the overall building than maybe expected.
 
Why are these temporary anchor supports still in place ??
They are permanent. They will stay like that and the beam itself will be visible in the stand.
The opening cleverly doubles up as the top oultet of a service riser that goes all the way down through the buildi g on each side. Removing the need to go through the roof. It is a dead space in ternally at that level so no real loss with that structure.
 