I do and again - that's part of the stage D design report. Stage D is design development under the 2007 RIBA CODING MATIRX

http://www.architecture.com/Files/R...actice/Archive/OutlinePlanofWork(revised).pdf

It's ok the client at this stage requesting a permanent / temporary structure for future use, but during design development it became apparent that it wasn't possible due to the nature of the existing roof.

That's why it changed


ermmmmm, the RIBA 2007 Plan was superseded in 2013 was it not?
 
Twitter @YourMCFC

image.jpg
 
Only 55 days to the opening of the 2015-16 season. I was wondering if the seats in the SS will be occupied BUT the Corporate section will still be in the process of
continuing to be "fitted out".
 
Only 55 days to the opening of the 2015-16 season. I was wondering if the seats in the SS will be occupied BUT the Corporate section will still be in the process of
continuing to be "fitted out".
Don't think all the people who spent £1200 to £1700 would be too happy if that happened. I presume you mean the premium seats not the corporate.
 
Is there an outrigger to go on the end of the roof? It looks to me that a lot of folks are going to get mighty wet in the bottom tier.
 
Does the fact that they haven't installed seats in the first 5 or 6 rows mean that they will be padded/fenced off as an additional corporate area?
 
Does the fact that they haven't installed seats in the first 5 or 6 rows mean that they will be padded/fenced off as an additional corporate area?
I don't think there's any corporate in the upper tier, the front seats are more expensive (about 10 rows), but doubt they'd be padded for £600, they have created an area for corporate in the second tier, I think its the most central block where the away fans used to be, and is for those using the lounge between the tiers (Legends ?).

Its probably because they need access for machinery from the entrances, so they'll be done last I expect.
 
I don't think there's any corporate in the upper tier, the front seats are more expensive (about 10 rows), but doubt they'd be padded for £600, they have created an area for corporate in the second tier, I think its the most central block where the away fans used to be, and is for those using the lounge between the tiers (Legends ?).

Its probably because they need access for machinery from the entrances, so they'll be done last I expect.
The corporate section is the middle of the two of the centralish blocks to the left as you look
I'd imagine this is for use for Legends Lounge people who will get a better view and atmosphere from up at the back of the second tier
 
Even better than MK Dons stadium where it is possible to watch a game whilst lay in the bed in your hotel room... with possibly a young lady under the covers with her mou.... err... moving swiftly on...
mkdonshotelpitchview.jpg
I'm staying there we'd to Friday this week
 
It can't not be ready, they've sold it out for the first game, and phoning everyone up and saying "ooops we're sorry we're not ready yet" isn't likely to be an option.

I really hope the first home game WILL be on a Saturday at 3-00pm K.O. With a sell out - over 50,000 fans -

Non of this SKY Monday 8-00pm rubbish.
 