Nou Camp Redevelopment

Jacob Smith

Well-Known Member
Joined
29 Sep 2014
Messages
2,011
http://bit.ly/1LQLwNW
Interesting. Seems they've been avoiding the regulations for years with the crumbled stairwells and seats where you can't see the pitch if you're taller than four foot.
 

Mike N

Well-Known Member
Joined
26 May 2004
Messages
12,325
Hope it doesn't take as long as the cathedral to complete.
 

its a Barm

Well-Known Member
Joined
29 Nov 2012
Messages
4,123
Location
Warrington
how are they going to do this while still playing there would take at least 2 full years to build this i would imagine they need to go to ground floor and build completly new, unless they do stand by stand and take 4 years.
 

DiscoSteve

Well-Known Member
Joined
30 Mar 2010
Messages
7,638
Location
201
I'm sorry but the current Nou Camp is a dung heap - nothing stunning about it at all - never judge a stadium by its seat count, as we know with The Swamp (1930's Maine Road excepted)

Its going to be a difficult job to keep the capacity up whilst they're doing the work.

Surely now we need to crack on with the North Stand Expansion
 

Gaudion M

Well-Known Member
Joined
5 Sep 2014
Messages
9,297
I'm sorry but the current Nou Camp is a dung heap - nothing stunning about it at all - never judge a stadium by its seat count, as we know with The Swamp (1930's Maine Road excepted)

Its going to be a difficult job to keep the capacity up whilst they're doing the work.

Surely now we need to crack on with the North Stand Expansion

Let's be realistic Maine rd was a dump, but it was our dump and it was massive in its day. 80k people and the toilets weren't connected to the sewer at the kippax side! God I miss that place!
 

Jacob Smith

Well-Known Member
Joined
29 Sep 2014
Messages
2,011
I'm sorry but the current Nou Camp is a dung heap - nothing stunning about it at all - never judge a stadium by its seat count, as we know with The Swamp (1930's Maine Road excepted)

Its going to be a difficult job to keep the capacity up whilst they're doing the work.

Surely now we need to crack on with the North Stand Expansion
Their average league attendance last season was only 77,623 and their three CL group games this year were all circa 70,000 so if they could start the redevelopment work at the end of this season and aim to have the bulk of it done by February 2017 then they'd likely not lose out on any capacity if they could shut 20,000 seats off at a time, although I'm sure it will take longer than that and be far less simplistic.

The new design looks stunning IMO - and while the current ground is a bit dilapidated, it is breathtaking purely because of the size of it!
 