Should have seen the first one he did, thought the hotel was a bunch of prefab offices .Sounds like a bingo caller.
Other than that ... dreadful. Needs to familiarise himself with the plans a lot better, it comes across that he doesn't know what he's looking at most of the time. Thank god we've got @cpoverview for the drone footage.
Was it mentioned (Quite a while ago) that the bridging structure between the two towers would be lifted into place in one go?
What was the rationale for building the towers initially as cantilevered rather than from the ground up from the outset?Meant to add previously, this will most likely only happen once the two towers have come fully to ground. The one has had the pier removed and ground prepped for piling, other one not far behind.
OK la.
What was the rationale for building the towers initially as cantilevered rather than from the ground up from the outset?
All the drawings are in application 136763/FO/2023 on the MCC planning portal (the direct links time out so do a search if needed).Used to work in a hotel for more than 20 years, I find myself more fascinated by the hotel construction going up floor by flloor than I am with the steel frame work.
Did they show detailed floor plans for the hotel during the unveiling? Cant remember. If so, where could I see them.
Thank you very much. Will have a gander.All the drawings are in application 136763/FO/2023 on the MCC planning portal (the direct links time out so do a search if needed).
Thank you very much. Will have a gander.
Love the look of that 2 floor presidential suite, nice.
Cant seem to find the main reception though.
Makes sense. Match day/coop arena riff raff on the ground floor, hotel starts on the first floor.It is on the first level above the square facing F&B units, there is a very small entrance area on the ground floor, takes people up to the level above where the hotel facilities start.