North Stand Construction Discussion

Was looking at the floor layouts and can see it now but doesn't appear to be any access between the buildings
Yea Centurions has pointed this out before. The space above L3 is all just extended office space, but the only link through is the one on L3 you highlighted. The rest will attach and visuay link, but with no access one to the other.

In fairness, the same happens on the hotel, other than it is the 8th floor with the only link through, to the rooms overlooking the pitch.
 
Another cracking video. Watched this on my TV for the 1st time. I couldn't believe the difference in picture quality compared to my laptop & phone. Keep it up matey.
Thanks "Stockton Heath Blue" will do, I enjoy seeing the transformation. Cheers
 
Just been past , one of the cranes attached to something on ground , bizarre if a lift is happening now ?
 
One of the odder sexual preferences I've heard of. That said, jrb has a thing for cranes, each to his own.

Actually it's a 'toss' up between a crane getting 'erected', or a 'piling' rig onsite.

TBH my preference is a piling rig. ;-)

Once you see a piling ring onsite, you know construction has started.

I had to contain my self every time it took pictures of the multiple piling rigs on the Coop Live Arena site. :-)
 
A preview picture, hence the watermarks.

A.P.S. (UK) / Alamy Stock Photo - Alamy

IMG_2276.jpeg
 
CP & SS.

A really good drone shot would be from the back of the CFA where the small grey arrow shaped storage building is located. You'll get the CFA, the Joie stadium, and the Etihad stadium all lined up in a row.(as shown in the picture) It's easy to drive around the CFA site, and to park up around there. There's a small grassy hill which is a decent vantage point, if my memory serves me well? When the CFA was being constructed I took quite a few pictures from that location.

PS. APS use a plane when taking aerial pictures.
 