North Stand Construction Discussion

Some screenshots from the latest B1M video on youtube. Full video for those interested:

Which features some models of the expanded stadium in a wind tunnel testing facility in Milton Keynes (covered for about a minute towards the end of the video)
 

Attachments

  • Screenshot_2024-06-26_at_12.52.47_optimized.png
    Screenshot_2024-06-26_at_12.52.47_optimized.png
    524 KB · Views: 214
  • Screenshot_2024-06-26_at_12.52.56_optimized.png
    Screenshot_2024-06-26_at_12.52.56_optimized.png
    368.7 KB · Views: 215
  • Screenshot_2024-06-26_at_12.53.07_optimized.png
    Screenshot_2024-06-26_at_12.53.07_optimized.png
    421.8 KB · Views: 205
  • Screenshot_2024-06-26_at_12.53.58_optimized.png
    Screenshot_2024-06-26_at_12.53.58_optimized.png
    656.4 KB · Views: 204
  • Screenshot_2024-06-26_at_12.54.19_optimized.png
    Screenshot_2024-06-26_at_12.54.19_optimized.png
    528.4 KB · Views: 206
Knew I had seen that specific shape somewhere else before!

View attachment 123465

It appears in a coule sections too, it struck me as odd/unfinished looking previously, but now makes sense.

@tailspin747, might reinforce our previous chat about how much inside it is coming away. I.e pretty much all of it!

It absolutely makes sense now. Clever design and use of that space.
 
It absolutely makes sense now. Clever design and use of that space.

That riser goes all the way down, as previously mentioned. And opens to that side, rather that through the roof. Basically, a big periscope with the new anchor at the top.
 
Some screenshots from the latest B1M video on youtube. Full video for those interested:

Which features some models of the expanded stadium in a wind tunnel testing facility in Milton Keynes (covered for about a minute towards the end of the video)


Well, that might answer my whistling analysis question then.

Looks too small a scale for that maybe, but chances are if they are going through with it they'd cover that too.

Been in that facility before, some of the stuff really is quite interesting. That's just the production bit, not the full testing side.
 
I'll be sticking to my phone for replays then.

The overhang of level 2 prevents the back 5 rows of level 1 from seing anything above.

Are the ones at the opposite side too far/small from where you are?
 
Some screenshots from the latest B1M video on youtube. Full video for those interested:

Which features some models of the expanded stadium in a wind tunnel testing facility in Milton Keynes (covered for about a minute towards the end of the video)


The MUEN do read this thread.

 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.