North Stand Construction Discussion

I find it amazing how they can perfectly match up the old terracing to the new terracing. One thing that I have noticed at the beginning of the video is there does seem to be a slight difference in height but I think it’s intentional. Spurs’ one tier stand also has a sort of small step up divider in the lower/middle area.

I thought that but it doesn’t look like it’s on the drawings.

IMG_6589.png
 
I was thinking about this back when the PA came out.

What point do they take as the topping out in this one?

Or do they have one for the hotel, one for the museum/office block and one for the stand.
Think but not too sure but each building when they finish the height they have going to have one.
 
Having had a hotel room in the Hotel in the main stand of MK Don's stadium - I really did have the 'if Carlsberg did Hotel Rooms' moment - I could see the pitch through the patio doors that opened to the back row of the stand - not ideal parading around the room exposing your gentlemen's sausage mind!
or your bush?
let-me-in-frank-rossitano.gif
 
More than likely I will miss it, some insider info of when it’s being lifted would be handy
Don't think it will be that quick an excersise. They will need to connect all the junctions, align and test, then remove the props. A couple large mobile cranes will appear on site beforehand. The rate they are have been going with the towers, looks like at least a week if not two away from connecting it, assuming the truss is built at the same time.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.