North Stand Construction Discussion

Jrb I think your source guy was right after all. It Was a 6.30 start on the lift, for them. He just didn't clarify that the lift is what now looks likely a three+ day undertaking. But all these things will be part of it to them.
 
  • Like
Reactions: jrb
Oh what! Must have been busy last night and this morning. Hope SS or CP got out there this morning
I'll be going down in about 30 minutes.

Getting ear wax removed from my left ear.(via Micro suction at North West Hearing)

I should be at the Etihad at 10:30am.

Hopefully I will catch the lift?

If not, I'll get some pictures of the steel structure in place.
 
From wolfie's picture looks like it is pretty much at full height. Guess it really was a 6.30 start today.
I arrived at work at 8:15 and it wasn't up. I looked across 15 minutes later and it was at what looks like full height. Guess it is being held up there now and will be bolted on during the day.

I've got a good view across from my office window so will keep an eye on any movement.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.