North Stand Construction Discussion

Guess you can see the sense in focusing all the terracing in the middle block, to get it done sonthe skybar terracing steel can overhang them now without needing to squeeze in the last few rows under it.
 
Guess you can see the sense in focusing all the terracing in the middle block, to get it done sonthe skybar terracing steel can overhang them now without needing to squeeze in the last few rows under it.
It’s almost like they know what they are doing
 
What if anything is in the PP for car parking to the hotel ??
TBH I can’t remember if there is parking provision or just drop off? I would expect there is parking provision. I’ll have a look at the PA when I’ve got time. Coatigan, Hellocity, or another forum member might know without looking through the PA.
 
What if anything is in the PP for car parking to the hotel ??
From what I remember, nothing. The minimum required Acc spaces, cycle spaces and thats it it joins on exiting parking on Alan Turner way. There is a 100+ page transport assessment that effectively justifies this, all the different public transport routes available, and this is not uncommon in urban settings.

Remember that there was an approval in place from 2014 as well as part of the south stand, and the infrastructure is largely there for the stand, which included a future north stand capacity and this is not an increase on that.

I'd have to look at it again for any more detail than that though, and it was some time ago so might need a memory refresh.

Edit, just had a quick look at the TA.
'No additional parking will be provided for the hotel or workspace use and those staff and visitors will be required to use existing on site parking. Around 150 spaces will be allocated for users of the hotel'.
 
Last edited:
From what I remember, nothing. The minimum required Acc spaces, cycle spaces and thats it it joins on exiting parking on Alan Turner way. There is a 100+ page transport assessment that effectively justifies this, all the different public transport routes available, and this is not uncommon in urban settings.

Remember that there was an approval in place from 2014 as well as part of the south stand, and the infrastructure is largely there for the stand, which included a future north stand capacity and this is not an increase on that.

I'd have to look at it again for any more detail than that though, and it was some time ago so might need a memory refresh.

Edit, just had a quick look at the TA.
'No additional parking will be provided for the hotel or workspace use and those staff and visitors will be required to use existing on site parking. Around 150 spaces will be allocated for users of the hotel'.
jrb and coatigan Thanks for your responses ! Cheers Dave
 
  • Like
Reactions: jrb

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.