Gone for a Burton
Well-Known Member
- Joined
- 9 Nov 2022
- Messages
- 4,518
- Team supported
- City
This is broadly what I've described on here on several occasions but with a capacity (I believe) of twixt 77/85k.I remember Franny Lee stating after he'd rebuilt the 15,000 seater Kippax, he would replace the North Stand and Platt Lane in the same way and fill in the corners to take the capacity to 60,000. There were loads of people whinging then that we'd never fill it. The same arguments were made when we moved from Maine Road. We'll never fill it.
I would rather we played in a bigger stadium which was full for the big games and less full for the average ones. You want the bigger matches to be special and have a better atmosphere, so the more the merrier.
One thing is certain, the current demand for Premier League matches and some Champions League matches far outstrips supply.
It will be interesting to see how they actually do the new roof on the North Stand.
If you imagine you took the whole roof off the stadium. Then added seats in the 3rd tier to extend the East Stand and Colin Bell to the same depth for their full length and filled in the corners to meet the North and South stands, ( ie have a full bowl all the way round at the top) it would probably hold 90,000-100,000. These seats would effectively be an extension on each stand, adding more hospitality.
If you look at the way the South Stand has been done, it would be easy to extend this round. So the major work would be taking the roof off each side and replacing it. However you could stagger it and do one corner at a time.
I think this is the long term intention. Mubarek hinted at a 90,000+ capacity in the future when they first planned the South Stand expansion.
If the capacity ever surpasses Old Trafford, and we fill it, then we truly have eclipsed them in every way. So I'm all for making it as big as possible!
A 'bowl',encompassing the spirals & with an adjusted rake, is built on land currently owned (which is a philosophy in UAE) and provides a huge amount of potential corporate space.
One elevation at a time consecutively.