It's like furniture from Ikea, that's the spare bit left over after they put it all together.The concrete stairs still not fixed into position , can’t think where there going .
(Picture credit ss skies )
BrilliantIt's like furniture from Ikea, that's the spare bit left over after they put it all together.
A set of stairs in a disabled bay ?Brilliant
Suppose they could turn it over and use it as a ramp ?? ;-)A set of stairs in a disabled bay ?
When do we think the old roof will be removed?
Can't be long now with the pitch covering having gone down.
The gantry for the mewps is still straddling the beams, snd they are still using that to connect the last of the new roof end pieces. Looks like that will be happening almost simultaneously with the old kalzip stripout, and then once the new roof is in place the gantry will go snd then the old beams. One big game of chicken and egg.They need to strip the panelling off first.
Potentially they could start pulling the beams down which have already been stripped rather than wait until they’ve all been done.
They’ll then use the mobile cranes to secure the beams while someone detaches them from the cable net support. When they’ve done that they’ll be able to pull the beams down and place them on the pitch.
Not showing on YouTube at the moment and won’t work on this site either. Very frustrating.Youtube obviously working from home today, maybe worth trying another upload?
That was the second one, first one said it was going to process in 14 hours!Youtube obviously working from home today, maybe worth trying another upload?