North Stand Construction Discussion

Had a bit closer look around this morning



Nice shot where the splice connection will come to the cantilever and the columns below. Waterproofing layer going down on the terrace both front and back, along with the curtain walling framing in. Nice to see the first terrace support connecting to the old stand at the perimeter.
 
Nice shot where the splice connection will come to the cantilever and the columns below. Waterproofing layer going down on the terrace both front and back, along with the curtain walling framing in. Nice to see the first terrace support connecting to the old stand at the perimeter.
Why is there a gap between the cantilevered top section and the steelwork that has been built from the ground up to meet it?
 

Attachments

  • Screenshot 2024-10-06 184901.jpg
    Screenshot 2024-10-06 184901.jpg
    324.4 KB · Views: 96

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.