North Stand Construction Discussion

No updates from me this week unfortunately , I’m working away until Saturday so will hopefully get one done on Sunday if the weather allows.
No problem, you do plenty for us on here and I am grateful for the updates. It will be interesting to see what will have changed this week next time you get the drone in the air.
 
No updates from me this week unfortunately , I’m working away until Saturday so will hopefully get one done on Sunday if the weather allows.

There is still a long way and plenty weeks to catch.

I'm assuming like most sites in the UK, this one will shut from the second week in December till sometime in January. So that one could be your last one till mid January.
 
There is still a long way and plenty weeks to catch.

I'm assuming like most sites in the UK, this one will shut from the second week in December till sometime in January. So that one could be your last one till mid January.
If we keep losing until then it might get shut down permanently!
 
The buildings will be connected part way up to the towers so that there is a tunnel for people to pass through City Square without needing to walk all the way around.

View attachment 138933
View attachment 138934
View attachment 138935

May be wrong but could see steel works starting at the towers and built across to the structure of the buildings. The exterior will match the design of the buildings so it all blends together.
That tunnel is going to get pretty congested on match days, it was bad enough before the North stand construction.
 