North Stand Construction Discussion

They will have to keep one crane for the fan zone roof steel sections, the remaining skywalk steel sections, etc. I could be wrong.

Could they not use a mobile crane?
For the square roof mobile would be my bet its going to be while before the it is done so keeping a static onsite would be expensive, might be a toss-up for the sky walk sections though as surely that must be soon
 
Would be interested to know how the water is drained off the new roof. Total guess it goes forward and to the sides and hits a drain whereas the older roofs tip the water backwards. Guessing we have gutters to avoid a Trafford Falls situation.
 
Would be interested to know how the water is drained off the new roof. Total guess it goes forward and to the sides and hits a drain whereas the older roofs tip the water backwards. Guessing we have gutters to avoid a Trafford Falls situation.
This was from cp overview drone video , you can see a gutter system at the end of the new roof .
 

Attachments

  • IMG_4127.jpeg
    IMG_4127.jpeg
    149.3 KB · Views: 48

Attachments

  • IMG_20250812_161721.jpg
    IMG_20250812_161721.jpg
    970.7 KB · Views: 95
  • IMG_20250812_161706.jpg
    IMG_20250812_161706.jpg
    872.4 KB · Views: 95
  • IMG_20250812_161617.jpg
    IMG_20250812_161617.jpg
    902.2 KB · Views: 99
  • IMG_20250812_161536.jpg
    IMG_20250812_161536.jpg
    1.1 MB · Views: 100
  • IMG_20250812_161324.jpg
    IMG_20250812_161324.jpg
    861 KB · Views: 98

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top