North Stand Construction Discussion

@cpoverview @ssskies
Loved the collaboration walk around thanks for the great work in 2025 here's to more in 2026
FYI
The "office" building; officially known as Commercial Building containing the club store, museum with top three floors being marketed as Medlock Square available in August, see the site below

IMG_5530.jpegIMG_5531.jpeg
Looks great in the CGI Images
 
Possibly. Which would be a shame, in my opinion. I'm eager to see what the stand will look like when completed. The covers being removed would be a help. Selfish, on my part? Possibly.
Won't be too long now. There won't be a problem filling them either, we can just put all of our injured players in there, that'll fill it nicely :(
 
Just a thought regarding the ongoing work in the corner. It looks as though a full size screen is highly unlikely given it seems windows will run all of the way along the new ‘boxes’. I can’t see any reason however why they couldn’t install a shorter screen (more of a scoreboard) above the boxes. Although this wouldn’t give full video, it would allow time, score etc and also look more finished by filling that corner space more effectively.
 

Attachments

  • IMG_6270.jpeg
    IMG_6270.jpeg
    656.6 KB · Views: 101
Was having a nosey at Trademarks... The Cross Bar logo is on there.
GB50110000004300291.jpg


And on a similar timeline... Printworks open a bar.... called... Crossbar
 
Is this a Clarkie?
Level 1 is the small section of existing seats, that is above level 0 ???
The new bit, once opened, will also be level 1 but from row ## onwards from where the existing level 1 seats end.
No, I’ve got it now. Just misunderstood it. Silly me!
 
Last edited:

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top