North Stand Construction Discussion

When we will see the new city square roof go in ? Presume it will have to be installed by the time the stand opens ?
 
About 8 row's up from the boy's putting the steps in there seems to be a gap at either end of a section of terracing . Anyone know why ?
It is where the temporary edge protection used to be fixed in. Then as they moved downwards had to remove it. You will see that right along the length of it, along that row, as more and more of the barrier comes away.
 
Well I think the construction updates have been excellent. Thanks for all the videos, diagrams and pictures etc posted here in 2024.

I never thought I'd be more excited over a construction site than the football. Old age does strange things.
I am concentrating on the construction as the football is far less interesting at present.
 
Apologies to SSskies after saying i wouldn't do videos on Fridays so we don't clash.
Still good to see how we manage to capture different things even though we flew virtually at the same time.


Apologies to SSskies after saying i wouldn't do videos on Fridays so we don't clash.
Still good to see how we manage to capture different things even though we flew virtually at the same time.


If you look at the terracing in front of the western tower it’s apparent that either 1or2 of the top pieces are missing ?? What’s the reasoning behind this ? Is it an access issue ??
 
Is there any drone footage of the new away fans area in ESL110/111 and the exclusive City end in SSL3/2.

Im receiving a lot of requests from my multitude of followers.

Merry Xmas to them all !!
 