North Stand Construction Discussion

I went on a 4 day MEWP course, the only thing I came out of it with was a desire never to go up in one again, and I've managed that and now my license has expired, thank fuck
I take it you suffer vertigo? I've been in hundreds of cherry pickers and the height never bothered me but the sway of the jib from inexperienced operators was a bit arse twitchy at times. Been up Rhyl Sky Tower on a 70m picker in 2002 which was the biggest picker in the UK at the time. Only when the basket was tied off was when I felt ok about it.
 
The dog leg part of the hotel is starting to make an impact on Joe Mercer Way. Currently on level 3. With level 4 starting.

PXL-20240724-182520777-MP-2.jpg


PXL-20240724-182544930-MP-2.jpg


All the cranes together.

PXL-20240724-182759464-MP-2.jpg


The top section of the dark grey cladding and the windows.

PXL-20240724-183023275-MP-2.jpg


PXL-20240724-183031737-MP-2.jpg


PXL-20240724-183048948-MP-2.jpg


The bottom section of the cladding.

PXL-20240724-183237873-MP-2.jpg


PXL-20240724-183257620-MP-2.jpg


PXL-20240724-183339927-MP-2.jpg


PXL-20240724-183357353-MP-2.jpg


Video.

 
I take it you suffer vertigo? I've been in hundreds of cherry pickers and the height never bothered me but the sway of the jib from inexperienced operators was a bit arse twitchy at times. Been up Rhyl Sky Tower on a 70m picker in 2002 which was the biggest picker in the UK at the time. Only when the basket was tied off was when I felt ok about it.
Dont suffer from Vertigo, I just prefer my feet to be on solid ground !
 
Same designers as City's new North Stand- Roma's new stadium features a proper home end, it's a pity that certain people at the club would rather chase cash instead of giving the ground a better atmosphere.

Its look like they have copied Spurs and Everton staduim and put the exective boxes on the other stands



1721884894159.png
1721887561866.png

1721888617956.png


 
Last edited:
The dog leg part of the hotel is starting to make an impact on Joe Mercer Way. Currently on level 3. With level 4 starting.

PXL-20240724-182520777-MP-2.jpg


PXL-20240724-182544930-MP-2.jpg


All the cranes together.

PXL-20240724-182759464-MP-2.jpg


The top section of the dark grey cladding and the windows.

PXL-20240724-183023275-MP-2.jpg


PXL-20240724-183031737-MP-2.jpg


PXL-20240724-183048948-MP-2.jpg


The bottom section of the cladding.

PXL-20240724-183237873-MP-2.jpg


PXL-20240724-183257620-MP-2.jpg


PXL-20240724-183339927-MP-2.jpg


PXL-20240724-183357353-MP-2.jpg


Video.



Still a bit to finish on that for the full thing to come together.

First reaction though, changing the louvered panel to a perforated one is a big big upgrade. The horizontal panels are darker and look better than in the visuals. They look the same colour as the perforated, is that how they looked in person? Suppose worth waiting till the caps are on. The shiny metal I think is a backing plate for the brick faced precast to come. Surprised they are not including one of the side panels as the solid verticals, described as fritted in the last NMA. Good photos Jrb, should hopefully be fully assembled within the next couple of weeks.
 
Do you think the two main stands will get done one day ? Also saw an article on Facebook recently one of those silly publications. It was called AI of premier league grounds 100 years from. Basically everyone ground was a bowl with wrap. Which is I think what will happen to most one thing I thought tho was do you think we will be able to keep the spirals or at least the points in the air even if they become the inside of the ground and get wrapped I think that would be something different and cool but I cannot describe it or mock it up
 
Do you think the two main stands will get done one day ? Also saw an article on Facebook recently one of those silly publications. It was called AI of premier league grounds 100 years from. Basically everyone ground was a bowl with wrap. Which is I think what will happen to most one thing I thought tho was do you think we will be able to keep the spirals or at least the points in the air even if they become the inside of the ground and get wrapped I think that would be something different and cool but I cannot describe it or mock it up
Plans & CGIs exist for CB & ES to be extended upwards & outwards to enclose the spirals.

Capacity will rise to 78000.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.