North Stand Construction Discussion

I think the new build has resulted in the redundancy of the Yellow Team Leader, as I've not heard any messages in the North Stand for them recently!
I fear for the Green Team Leader too - they've both been sacked I heard - caught watching videos of rags getting beat on shift I believe!
 
I'm with DiscoSteve on this one. The cylinders align with new rainwater ducts coming down from the roof. They'll probably be wrapped in something more elaborate to finish them off.
View attachment 136470
Which is drainage. As others have said.

Edit, apologies if that reads as arsey reading it back, was a rushed post, not meant to be.
 
Last edited:
Apologies for only just posting the pictures.

The pictures were taken on Sunday morning.

Slightly different today.

4 sets of pictures over 4 posts.

1. Left side of the construction site.
2. Hotel and centre of the construction site.
3. Right side of the construction site.
4. Wide angle pictures.(from the camera phone)

As you can see, the replacement sail/fins look exactly the same as the other sails/fins that were removed.

DSC05913.jpg


DSC05909.jpg


DSC05910.jpg


DSC05912.jpg


DSC05908.jpg


PXL-20241027-112239512-MP.jpg


DSC05914.jpg


DSC05911.jpg
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.