North Stand Construction Discussion

Great vid CP. The whole skybar 'cage' now seems complete, including that missing horizontal that was intriguing me. I might have to put it down to simply being missed out while it was on the ground and rather than delaying the big lift, added later on. Also now pretty clear to see how it curves in both directions.

Other small things worth noticing, the first waterproofing layer has started on the east end of the hotel roof. The west tower has had the platform scaffolding around the cable anchor removed and this clamp arrangement is now much more obvious. The east tower is still there but looks like they have started dismantling it. The splice connection plates on the sky bar truss have not yet been coated, I would assume due to the recent temperatures, as below 5deg, the intumescent won't stick to the steel. There seem to be two additional site cabins added within the stand itself either end of the level the previous boxes were. With more going on in there in terms of connections. The eastern side of the terracing seems to be going faster than the west. The office block moving at pace, again there is a temperature below which concrete won't pour, so that might go slower than the hotel did over the winter months.
The more this build progresses the more confused I am by the sample panel , the panel shows facework to both sides ?? I understand the bwk. Is only to the hotel ground floor but you can now see blockwork appearing ??
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.