North Stand Construction Discussion

As the Commercial Building (Office Block) continues to progress into the New Year a few points of interest for Colin to pick up on Drone footage happens at Level 03. The slab steps out here so the floors above will be supported on Concrete Corbels and Cantlever Beams. These are heavily reinforced and needed intricate detailing to fit. The steel fixers are doing an excellent job and this area will certainly be a test for these guys!
1734687268170.png
 
It's a wonder the red top newspapers haven't done a hit piece on us "Man City building their new stand outside of the ground"
 
About 8 row's up from the boy's putting the steps in there seems to be a gap at either end of a section of terracing . Anyone know why ?
 
This is my go to thread on Bluemoon as it is the only positive topic on the forum. Thank you to SS Skies and CP Overview for the regular content over 2024 in what has been another rollercoaster year for Manchester City. These videos are a promise of something better in 2025. 2024 wasn't too bad to be fair but the more recent memories have over-printed more successful times.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back