DiscoSteve
Well-Known Member
- Joined
- 30 Mar 2010
- Messages
- 9,325
- Location
- 101 (was 201 in old money)
- Team supported
- Manchester City
I did wonder if the top chunk (crap description I know) has actually been pulled up and in a bit by the load of the cable-net and when the plate is put in and the gap is finally closed up, that load will be properly taken up by the whole lot being properly anchored to the ground at the back.



