North Stand Construction Discussion

I’ve enlarged the picture on my iPad and screen grabbed it. Click on it and download it, arrow pointing downwards, top right, to see the full size vertical screen grabbed picture on Postimage. If you have an iPad you can stretch the picture more with your fingers. Not sure about other makes of tablet devices.

Looks like they couldn’t be bothered with the brickwork on the mock-up.

41-E7-A96-C-A336-4-A86-99-D5-F7-C1-D6480-EFD.png


D96-BEB5-B-0756-43-F1-ADB6-065-E78-ED54-EB.jpg


You can see how the individual fins align on the exterior cladding of the hotel in the diagram below.
C5-C5-FE60-D9-C5-4-E48-976-B-CA237-FF13-A1-A.jpg


According to the amended PA the hotel fins are (white coated?) Aluminium. 5 descriptions down on the right, along with an arrow pointing to the fin.

9-A9-F28-ED-94-F8-4-E1-B-B898-3-D8-B418-DCAF8.jpg


If anyone else wants to dig through the North stand redevelopment PA’s, including amendments, the link is below.

 
Last edited:
Foster was a long distance runner 5k & 10k.
Ovett, Coe & Cram were middle distance runners and ran 800 & 1500m. Cram came to prominence towards the end of the careers of Ovett & Coe
Correct. IIRC Coe & Ovett ran their last olympics in LA 1984. Cram was the successor to them both, and I think Peter Elliott??? also came on the scene.
 
I’ve enlarged the picture on my iPad and screen grabbed it. Click on it and download it, arrow pointing downwards, top right, to see the full size vertical screen grabbed picture on Postimage. If you have an iPad you can stretch the picture more with your fingers. Not sure about other makes of tablet devices.

Looks like they couldn’t be bothered with the brickwork on the mock-up.

41-E7-A96-C-A336-4-A86-99-D5-F7-C1-D6480-EFD.png


D96-BEB5-B-0756-43-F1-ADB6-065-E78-ED54-EB.jpg


You can see how the individual fins align on the exterior cladding of the hotel in the diagram below.
C5-C5-FE60-D9-C5-4-E48-976-B-CA237-FF13-A1-A.jpg


According to the amended PA the hotel fins are (white coated?) Aluminium. 5 descriptions down on the right, along with an arrow pointing to the fin.

9-A9-F28-ED-94-F8-4-E1-B-B898-3-D8-B418-DCAF8.jpg


If anyone else wants to dig through the North stand redevelopment PA’s, including amendments, the link is below.

Looks like they didn’t bother with the different sized fins either, unless your photos are an optical illusion.
 
Looks like they didn’t bother with the different sized fins either, unless your photos are an optical illusion.

You are right. But don't really think that would have told us much more if they had done.

I mostly get what they are trying to do, I don't get why they didn't try colour match the frame to the panels. Would have hidden a multitude of sins.
 
I’ve enlarged the picture on my iPad and screen grabbed it. Click on it and download it, arrow pointing downwards, top right, to see the full size vertical screen grabbed picture on Postimage. If you have an iPad you can stretch the picture more with your fingers. Not sure about other makes of tablet devices.

Looks like they couldn’t be bothered with the brickwork on the mock-up.

41-E7-A96-C-A336-4-A86-99-D5-F7-C1-D6480-EFD.png


D96-BEB5-B-0756-43-F1-ADB6-065-E78-ED54-EB.jpg


You can see how the individual fins align on the exterior cladding of the hotel in the diagram below.
C5-C5-FE60-D9-C5-4-E48-976-B-CA237-FF13-A1-A.jpg


According to the amended PA the hotel fins are (white coated?) Aluminium. 5 descriptions down on the right, along with an arrow pointing to the fin.

9-A9-F28-ED-94-F8-4-E1-B-B898-3-D8-B418-DCAF8.jpg


If anyone else wants to dig through the North stand redevelopment PA’s, including amendments, the link is below.

If you look at the photos from SSC, there are bricks underneath the mock up that look ready to be built?

https://forums.bluemoon-mcfc.co.uk/attachments/1000022415-jpg.128083/
 
  • Like
Reactions: jrb
Wonder if they might build the brick (for the sample only) the conventional way, if the bottom setting out is anything to go by.

If you look at the photos from SSC, there are bricks underneath the mock up that look ready to be built?

Yeah I pointed that out in the initial post, although they could just be setting out the top panel. Either that or they think a few loose bricks is enough to give an idea of the colour/tone. Which you'd hope not, but given how they have gone about this I wouldn't put past them now. The brick pier and upper panel is meant to be panelised, as lets wait and see when they finish it off.
 
Last edited:
Yeah I pointed that out in the initial post, although they could juat be setting out the top panel. Either that or they think a few loose bricks is enough to give an idea of the colour/tone. Which you'd hope not, but given how they have gone about this I wouldn't put past them now. The brick pier and upper panel is meant to be panelised, as lets wait and see when they finish it off.
I don't like bricks. Doesn't fit in with the rest of the stadium area
 
More amendments.

Click on the link below and go to the cover letter for more details.

North Stand, Etihad Stadium - Application for Non-Material Amendments to Planning Permission 136763/FO/2023 (as amended by 138417/NMC/2023, 139992/NMC/2024 and 140444/NMC/2024)

Please find enclosed an application under Section 96(a) of the Town and Country Planning Act 1990 (as amended) in order to make a Non-Material Amendments (“NMA”) to Planning Permission Ref.136763/FO/2023 (as amended by 138417/NMC/2023, 139992/NMC/2024 and 140444/NMC/2024) to
introduce a series of amendments to the consented scheme (“the Application”).