wolfie1988
Well-Known Member
If you look at the photos from SSC, there are bricks underneath the mock up that look ready to be built?I’ve enlarged the picture on my iPad and screen grabbed it. Click on it and download it, arrow pointing downwards, top right, to see the full size vertical screen grabbed picture on Postimage. If you have an iPad you can stretch the picture more with your fingers. Not sure about other makes of tablet devices.
Looks like they couldn’t be bothered with the brickwork on the mock-up.
You can see how the individual fins align on the exterior cladding of the hotel in the diagram below.
According to the amended PA the hotel fins are (white coated?) Aluminium. 5 descriptions down on the right, along with an arrow pointing to the fin.
If anyone else wants to dig through the North stand redevelopment PA’s, including amendments, the link is below.
https://forums.bluemoon-mcfc.co.uk/attachments/1000022415-jpg.128083/