eyalluvitt
Well-Known Member
Common Red?Saw today they doing brick work on lower floors
Common Red?Saw today they doing brick work on lower floors
I do now... but I didn't on sunday nightI do so go fuck yourself.
That is an impressive construction site and a great video to watch.Picture credit CP Overview.
I enjoyed seeing the sweeping and curved top of the steel, and the obvious floating 3rd tier below it.
View attachment 140861
The breeze block walls weren’t as exciting to see, but they are another milestone in the construction of the hotel.
View attachment 140862
View attachment 140863
Think there a diagram on here someone posted about it , can't find it .Is it me, or is one wing of the hotel going to be 1 level lower than the other?? It looks as though the E/W is stopping at floor 7, whereas the N/S is up to floor 8…

Absolutely. Also to yourself for the ongoing pics. And others for sharing what they know about construction. It’s all a welcome distraction from events on the pitch atm.A big thanks to CP Overview and SS Skies for their drone videos of the build this year.
To drop any unwanted away fans who get tickets in our end from? ;)About 8 row's up from the boy's putting the steps in there seems to be a gap at either end of a section of terracing . Anyone know why ?