Challenger1978
Well-Known Member
Damocles said:BingoBango said:Doing only the minimum required by your contract - no overtime, following rules and regulations to pedantic detail to the point of a go-slow, not replying to emails or answering phones, that sort of thing.
So are the council permanently on work to rule then?
Lmao they must be.
I shit you not a guy came into my house last week and all he had to do was cut a 1 metre piece of skirting board and glue it to the fucking wall (it was behind my cooker so i didn't even need skirting board there), the twat took nearly 5 hours to do it.
Actually to emphasis how fucking lazy the twats are its took around 4 blokes from 8am to 5.30pm every week day for nearly 4 weeks now to fit a new bathroom and kitchen in my house. The same job i did myself a couple of years back (i spent over £8,000 on good stuff that didn't need replacing and they've replaced it with generic council shite the bastards) on my bleeding own in a just over a week and to a higher standard than these fucking cowboys are doing.