The transport infrastructure is what needs sorting and should have been sorted decades ago.
Manchester to London is 163 miles on the train and the trains can do 125MPH. If we assume an average speed of 100MPH, a direct, non stop train should take 1hr 40 mins.
Imagine running them, once an hour, until 0100 every day. Then, when northern teams are at Wembley, you could run non stop to and from Watford in 1hr and 25 minutes. It’s really not complicated but the willingness to keep most of this country as a transport backwater, whilst banging on about climate change and reducing emissions is staggering.