Re: Etihad Campus, Stadium Development and Collar Site (cont
presumably because City's cable net 21st Century construction is a little harder and more complicated to overhaul than the 19th Century Meccano construction used at the swampstag said:117 M34 said:I thought I felt closer than beforeworsleyweb said:Because the roof has to be taken off using cranes pitch side - it will take about 5 weeks minimum and would destroy the pitch. Laing offered City a £1 million saving on the tender if they took the roof off the South Stand during the last close season but City said no. This (the taking of the roof off) is the tightest element of the construction programme next close season, due to interface with pitch works needed to make front 3 rows site lines work better. The pitch height has actually gone up 80mm since we moved in the stadium.
How did United take of the old east and west stand roofs mid season if it wasn't by using cranes from pitch side? The new roofs were complete before the old ones came off very similar to what we are doing and the stands were partially open by around the Feb I think.
Just thought it'd be great if the south stand upper tier was partially open by the end of the season and we could get a 50k+ crowd this season