Etihad Campus, Stadium and Collar Site Development Thread

I think ....

... the groundsmen now have the job of finding and recovering balls that go into the stands and

... There are cones placed around the pitch with spare balls on them for players to pick and use (pre-disinfected of course.

Also ... will Sly skip to adverts in the drinks break - if so, how long before we play a game of 4 quarters

Football as we knew it might have “gone”

Come on City

PS ... any body know why there is scaffolding at the North end as show in photos above?
Also ... will Sly skip to adverts in the drinks break - if so, how long before we play a game of 4 quarters

If it continues next season, the answer is not long.
 
Great time to invest, get a better price at the moment, bigger choice of developers. Would be a statement of intent, that we have beaten the bullies and are very much here for the long term. Would be a great long term investment for our owner. Its time to get the North Stand and roof done.
 
2020/21 would be a perfect opportunity to expand and improve.

Get the stadium upgraded and improve capacity when the fans are allowed back in.

Great time to get the exterior sorted, looking very shabby all around the stadium.
It was designed in the 1990s, which is a long time ago now, and it’s looking its age!

The posters on the facade of the stadium look like a teenagers bedroom wall. I know they’re trying to mask the drab decor but it’s not a good look. Something much classier needs erecting around the ground.

The floor around the outside of the stadium is the worst part. When it rains, the amount of puddles and the size of those puddles is really poor for what is supposed to be one of the best run sports clubs in the world. Dog shit alley in Moss Side was easier to walk down than the slalom ski route you have to take to avoid all the puddles down the back of the East Stand at the Etihad. Especially now with the ridiculous queues because of the delayed entrance to the ground.

And Joe Mercer Way is slippery when it rains.

Also, still, after nearly 20 years of being there, anyone who leaves the stadium via Entrance K of the East Stand, still has to add about a mile onto their walk back to Town (either by going all the way around the stadium or walking all the way up to the bridge on ANR, due to the away fans’ coach park).

Metrolink also need to give the roof on the way to the steps at the Met stop a good clean. Have you ever looked up when stood under there? Fuck me, it’s filthy!

The upkeep of buildings, pavements and roads in this city as a whole is very very poor. Buildings get built, look great for a while, but then after a few years start to weather or get dirty and they just aren’t cleaned often or well enough. And once a few knob heads have thrown their chewing gum on the floor (they make the city look like it’s got small pox... if I was Andy Burnham I’d ban the sale of chewing gum in Greater Manchester) and UU or the Council have dug up part of the pavement or road outside them and put their standard woeful patchwork cover up over it; it only takes a decade and that once shiny new building with lovely footpaths looks like shit again!

The inside of the ground is quite nice. Outside the ground looks like it’s been forgotten about.
 
Last edited by a moderator:

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.