Blue Maverick
Well-Known Member
- Joined
- 6 Aug 2010
- Messages
- 25,348
In Manchester it's 4 pumps initially, this can be quickly made up for extra pumps and platforms although I think we only have 4 left in Manchester now, no water tanker as water is from the mains and pumped into the base of the tower allowing crews to plug in inside.I would imagine the PDA for a fire in a highrise building would be 4 pumps ,water tanker and at least 1 height platform at the initial stage of the incident.