North Stand Construction Discussion

What always amazes me is how they can place and build everything exactly in the right place. A bit like fixing a floating shelf level on a wall at home. :-)
 
Last edited:
See the old giant feature downpipe is gone. Wonder where they are draining the low point to now.
 
The middle bit, the end closest to the existing stand, is the start of your GA+ hospitality bar.

Proposed in the PA. ;-)

Let’s wait and see what the club announce.

Good spot though. :-)

When was or is the next meeting with the club about the North stand?

Alex mentioned it after the last meeting.
 
Anyone else surprised by the amount of bracing on the middle section? The city hall and open void above it is not quite as open as the plans suggest. Unless the red ones are temporary.
 
Last edited:
Proposed in the PA. ;-)

Let’s wait and see what the club announce.

Good spot though. :-)

When was or is the next meeting with the club about the North stand?

Alex mentioned it after the last meeting.

Yeah not to get into it again haha. A bar is a bar after all. More for bearings. Let's call it 'the purple' bar.
 
Pretty sure 2 temp RWPs are being Installed to the same point. There's quite a bit of temp RWP going in over the next few weeks.
I can see why they removed the big one, it came at an angle, and would have been in the way of the middle bit they are now building. You can see where it all collected, one big point.

That side and front bracing on the middle bit surely has to be temporary. Right on the middle of the double height space.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.