Gps mate.
Pictures from the drone video. Credit CP Overview. (thanks for the great drone updates)
View attachment 120217
View attachment 120218
The middle bit, the end closest to the existing stand, is the start of your GA+ hospitality bar.
Proposed in the PA. ;-)
Let’s wait and see what the club announce.
Good spot though. :-)
When was or is the next meeting with the club about the North stand?
Alex mentioned it after the last meeting.
Pretty sure 2 temp RWPs are being Installed to the same point. There's quite a bit of temp RWP going in over the next few weeks.See the old giant feature downpipe is gone. Wonder where they are draining the low point to now.
I can see why they removed the big one, it came at an angle, and would have been in the way of the middle bit they are now building. You can see where it all collected, one big point.Pretty sure 2 temp RWPs are being Installed to the same point. There's quite a bit of temp RWP going in over the next few weeks.