richards30
Well-Known Member
- Joined
- 20 May 2009
- Messages
- 28,174
Well I am glad. Having kinda cried wolf once or twice and sent poor CPoverview hovering over random bits of compound glad if it turns out to be it. It'll take a few.l days to assemble it all, I'm sure. Assuming they have the materials on site.
400 million ishanyone know the combind cost of hotel and stand?
wow,,,,cheers400 million ish
Screen grabbed from one of the pictures.
Is that the 2nd cut white line around the steel mast?
The yellow support starts are above the line.
400 million ish
wow,,,,cheers
Can somebody please explain to me in layman's terms, what the fuck is a 'mock-up frame/cladding' as I've been following this thread and seen the term mentioned on numerous occasions, cheers.I'm going to break the pictures down over 5 posts so they aren't all lumped together in 1 post.
1. Etihad stadium from the bridge & Joe Mercer Way.
2. Mock-up frame and left side of the construction site.
3. Centre of the construction site.
4. Right side of the construction site.
5. North stand steel frame.(close up)