It was great to get feet on the ground and the first pieces of Ductwork in the air over at the Etihad Stadium this week. We started the project with a productive workshop looking at the different Fire/Smoke Dampers and installation methods with the manufacturers that we will be using throughout the project. The site set up for the lads looks fantastic and the new stand is already looking impressive and we can't wait to see the finished product.








