Finally got the roof lift
Finally got the roof lift
An elaborate, real life game of Top Trumps? ;-)I wonder why it is longer than the first one they put up?
Limits on the crane maybe? The inner one with the extra bit might have just been that bit too heavy due to its slightly longer geometry on the curve. If that makes sense. So had to stop it at a more logical place to allow next section to join on.I wonder why it is longer than the first one they put up?
I wonder why it is longer than the first one they put up?
It doesn't appear to me to be more than 700mm, I would much sooner see the finish before judging however, the gap is so noticeable, they must have plans for them, I'm suspecting the one in position is a dummy run / trial.Beam 2 of 14 in, 12 to go. Well, in two-third segments at least, the reat all to come at some point later.
What do we recon the depth is of that sail at its widest point? Hard to tell at an angle but looks at least a good 700mm, maybe even 800ish. Glad to see they didn't spindle the shit out of it.
I'm certainly not the best qualified to help in this but, when I have an issue uploading on my phone I email them to myself and load from my laptop mate, hope that helps.Annoyingly, I can't post a photo with the beams on the ground. I reckon between 3-4 ft depth
I'd be very surprised if they did anything with the gap. It is such a bastard to detail, that, to try hide. Think they'll just accept it.It doesn't appear to me to be more than 700mm, I would much sooner see the finish before judging however, the gap is so noticeable, they must have plans for them, I'm suspecting the one in position is a dummy run / trial.
I think your probably right and accepting it would be the best way to deal with it, I had thought at one point there may have been a lateral slat that ran through all of them but, when I thought about the position of the gap I doubt that they will do that or that it would visually work.I'd be very surprised if they did anything with the gap. It is such a bastard to detail, that, to try hide. Think they'll just accept it.
The best that I would hope for, would be that the gaps are staggered and are not always in a line. I.e different sizes of components and it varies with the change in sail geometry. The fixings are all regular, but could still be cut in ways that lets that happen.
I think your probably right and accepting it would be the best way to deal with it, I had thought at one point there may have been a lateral slat that ran through all of them but, when I thought about the position of the gap I doubt that they will do that or that it would visually work.
Down at the Etihad today, filming between hail stones video is here
Same video without the fast timelapse, 26 minutes to get from the ground to in position
Superb work! What scares me, however, is the railings are still attached on the trusses, which apparently mean some poor buggers will be expected to walk along all the trusses to bind them together, then, remove the railings. I hope they get paid well.
Superb work! What scares me, however, is the railings are still attached on the trusses, which apparently mean some poor buggers will be expected to walk along all the trusses to bind them together, then, remove the railings. I hope they get paid well.