Stadium Developments thread

They are supposed to be back in a partially completed stadium in November, looking at the recent pictures I would be amazed if it happens.

View attachment 109395

I wouldn’t be surprised if they spent next season at the Olympic stadium as well.

I think the idea was to get the bottom 2 tiers ready with the new changing rooms etc and then play and build around the construction.
 
Barcelona. For club that’s over £1bill in debt, Barcelona are doing an excellent job of funding the €1.4bill redevelopment of the Camp Nou, aren’t they Tebas? ;-)

Spanish soccer giants Barcelona have agreed a €1.45-billion ($1.6-billion) financing deal for their Espai Barça project that will see work begin to renovate the iconic Camp Nou stadium.

 
How to change an 85,000 capacity football stadium into a 85,000 capacity indoor arena.

The video is slightly old as the Bernabéu is now completed.

The new Santiago Bernabéu stadium (home of Real Madrid) boasts a groundbreaking retractable pitch technology, offering unmatched versatility and event flexibility. Imagine a massive tray system holding the entire pitch, complete with grass, soil, and drainage. This tray weighs a staggering 3,000 tons! Underneath the pitch lies a gigantic "hypogeum," essentially a climate-controlled underground garage. Eight massive steel carts, each carrying a section of the tray, run on rails that connect the pitch to the hypogeum.

As great as the CO-OP is would have been a good way to save space for other developments and get a bigger arena if we turned the Etihad into a in door arena either full time (new stadium ) or part time
 
As great as the CO-OP is would have been a good way to save space for other developments and get a bigger arena if we turned the Etihad into a in door arena either full time (new stadium ) or part time

I agree. That would have been amazing.

It cost Real Madrid £1.2bill to redeveloped and put a closing roof on the Santiago Bernabeu stadium.

CFG‘s partnership and investment in the Coop Live Arena with OVG cost circa £190mill each, which includes increase constrution costs. The original cost of the arena was supposed to be in the region of £365mill.
.
 
As great as the CO-OP is would have been a good way to save space for other developments and get a bigger arena if we turned the Etihad into a in door arena either full time (new stadium ) or part time

The size of the Etihad is too big to be a general arena like the CO-OP.

This is the kind of venue which will host awards nights, comedians, exhibitions, boxing (not always super fights), WWE, and artists which wouldn’t fill the stadium, never mind for several nights.
 
I agree. That would have been amazing.

It cost Real Madrid £1.2bill to redeveloped and put a closing roof on the Santiago Bernabeu stadium.

CFG‘s partnership and investment in the Coop Live Arena with OVG cost circa £190mill each, which includes increase constrution costs. The original cost of the arena was supposed to be in the region of £365mill.
.

Closing roof !! I bet some soft footballers will still wear gloves
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.