HelloCity
Well-Known Member
Yeah just the 11 months!
Another 27-30 months to go.
Tbf, the steel only started going up in March.
The steel structure should be mostly up by the start of next season.
Yeah just the 11 months!
Another 27-30 months to go.
Yeah just the 11 months!
Another 27-30 months to go.
Tbf, the steel only started going up in March.
The steel structure should be mostly up by the start of next season.
thats the full completion right including hotel etc?
Just like we only started playing well in March!
I know yeah you are right, but you still can't start it and fly up that quickly without those 8 or 9 months of ground works in preparation.
It wasn't that far into the summer from memory, pretty much once they prop the old one. At some point in the off-season.Do you recall when the new roof will start going up?
Are we rebuilding the Gene Kelly standColin Bell side.
![]()
![]()
![]()
![]()
Yes, I've been looking at the plans and locating the stair and lift wells and matching them up to the concrete cores going up, it really does show just how big a project it is.@jrb Those stills from the drone screen grabs are truly impressive. Plans do not show the scale of the development. It is massive, looking like a a unique concept that I've never seen before in a stadium, especially when linked to Co-op Live. Maybe more thought has been given than we give credit? If so, we can only hope the same consideration extends to the fans experience and atmosphere in the ground.
Are you from Stockport?It’s fucking massive!
The new stand is now visible over the North stand roof
@jrb Those stills from the drone screen grabs are truly impressive. Plans do not show the scale of the development. It is massive, looking like a a unique concept that I've never seen before in a stadium, especially when linked to Co-op Live. Maybe more thought has been given than we give credit? If so, we can only hope the same consideration extends to the fans experience and atmosphere in the ground.