North Stand Construction Discussion

Yes that makes perfect sense sense you can see 2 yellow connectors have been installed in the terrace and the (assumed )2 final supports are already on site
 
Maybe gives them a bit more license to get closer. Some excellent shots in there.

So, that's all 6 of the remaining (main) beams almost ready for the lift? It seems to crack on every time I come back to this thread.
Still missing the final 2 tho’
 
I'm quite surprised that there are stairs for access to the upper tier, I would have throught this was an excellent opportunity to incorporate escalators (unless this is the case and we cannot see them)
 
I think it's as @HelloCity said on the previous page, the 2 outer ones are not straight runs but are heavily kinked in, so probably built almost ad hoc.
I think same format but smaller section ( look at the outer post, same connector but reduced size)and because of the permanent end columns and kink maybe 2 or 3 separate pieces
 