With two weeks until our next game I can see a lot happening between now and then. Both pitchside and 3rd tier.
When do we think the whole structure be completed by? They are doing the roof now, all the stand is in minus the seats, after the roof surely it's just the fixture and fittings?
Won't be finished until August. There's absolutely loads to do within the structure itself. Then there's the small extensions to the ends of the South CB/ES level 3 as well.
cb/es have just been started on so their will be changes for the Newcastle game before the corner parts of the roof can go on so expect level 3 of the CB/ES to be completed next month the seats on the perimeter were just for show and haven't been bolted on
yet the view is not great atall but expect Level 3 CB/ES and the additional rows to be opened by the last few games of the season