Fat Chance
Well-Known Member
- Joined
- 2 Jul 2009
- Messages
- 2,856
Re: Etihad Campus, Stadium and Collar Site Development Threa
I noticed they've started to do work on the canal towpath up in the clayton area (the strip between the Bridge pub and Ciba was obviously a taster of things to come), presumably it's to do with the monies that was designated for extra cycle paths (was it £20mills) a while back (Ashton to town being one of the designated routes)
I noticed they've started to do work on the canal towpath up in the clayton area (the strip between the Bridge pub and Ciba was obviously a taster of things to come), presumably it's to do with the monies that was designated for extra cycle paths (was it £20mills) a while back (Ashton to town being one of the designated routes)