GXCity
Well-Known Member
Re: Etihad Campus & potential new stadium
Correct but that isn't the plan at the moment.
With the current extensions plan the option to extend further is possible when required. This has been at the forefront of all of the different options presented to AD.
In fact I am just looking at it now and I suspect that the roof could stay as it is and you could still join the extended north and south stands with the thrid tiers on the east and CB. Not sure you would get up to 90k but 80/75k looks achievable to me with the current roof structure.
jonmcity said:GXCity said:jonmcity said:Take the roof off and we can go as high as we want, we may get wet while it happens though.
We don't need to take the roof off or affect its structure. The internal tensioning ring doesn't need to be touched while the extensions are being built.
People have posted pictures of this being in place during the Commonwealth games. I don't even think they would need to close the 2nd tiers as all the construction work would be behind the stands.
Correct for 60k but when we want to go to 80 or 90k the roof will need to go.
Correct but that isn't the plan at the moment.
With the current extensions plan the option to extend further is possible when required. This has been at the forefront of all of the different options presented to AD.
In fact I am just looking at it now and I suspect that the roof could stay as it is and you could still join the extended north and south stands with the thrid tiers on the east and CB. Not sure you would get up to 90k but 80/75k looks achievable to me with the current roof structure.