Rammyblues
Well-Known Member
Re: Etihad Campus & potential new stadium
I am not an engineer nor builder so I could be completely wrong. If we take off the roof it won't IMO be just to add some more seats. Looking back at the designs and some pictures shown on this thread a lot of the stadia have hotels incoporated into the structure, maybe with a good summer it could all be achieved. If that were to happen I suspect the club might ask the fixtures committee to make say last four fixtures of one closing season away and first 4 fixtures of new season away thereby giving us an extra couple of months, but I am just guessing. I re iterate though only IMO will this happen once the academy building all completed.
Why not remove the roof completely in a week and replace it with another design which is designed to meet up with a future expanded stadium. Effectively the roof will be a 'floating design' suspended by additional cables until the new stands are built and connected to the outer edges of the roof. This could easily be done in the close season.
This then frees us to build additional stands as and when with no disruption.
Or am I being a bit thick?
I am not an engineer nor builder so I could be completely wrong. If we take off the roof it won't IMO be just to add some more seats. Looking back at the designs and some pictures shown on this thread a lot of the stadia have hotels incoporated into the structure, maybe with a good summer it could all be achieved. If that were to happen I suspect the club might ask the fixtures committee to make say last four fixtures of one closing season away and first 4 fixtures of new season away thereby giving us an extra couple of months, but I am just guessing. I re iterate though only IMO will this happen once the academy building all completed.