Manchester’s Changing Skyline

Trinity Island (phase 1) - 60/55 stories - Regent Road - Salford

71E4D7FE-EBF1-4A0F-8BDC-D19EF5BA0A89.jpeg

mcr_skyline - Instagram

85659ACF-AF75-4ABD-90E0-84535E0F3938.jpeg

C05E925D-69ED-4CAC-B1D4-84B64D335A79.jpeg

CB94C58E-939F-4104-A166-65313332BCD2.jpeg
 
Last edited:
Victoria Riverside - 37/26/18/6 stories - Red Bank - City Centre

149CCC60-F0AE-42E7-B0AD-A5AAE59FA7EA.jpeg

CSI PROP - Linkedin

Victoria Riverside, Manchester | Construction Update

Here are photos and updates from the site of Victoria Riverside in Manchester, latest update of December 2022.

According to updates from the developer (FEC UK): the concrete frames are progressing swiftly with Tower B close to completion. Tower A has reached level 11 and Tower C is at level 15.

Further key milestones have been reached across build this period, with the installation of the unitised façade commencing. The façade has now reached level 4 on Tower C and level 2 on Tower B, allowing for the scheduled internal fit-out to commence. The internal fit-out will include the creation of interior walls alongside elements of electrical, plumbing and mechanical engineering.

The construction schedule for 2023 forecasts completion of the concrete frames at Towers B & C, and the commencement of lift installation and fitting of the unitised façade to Tower A. Further progress on the internal apartment fit-outs can be made once the façade has been installed.

7FBFDE94-4461-47C9-9F3C-694C91D36B5F.jpeg

383883CD-A61B-46FA-B66D-61F6C6524445.jpeg

CB83BA64-EA99-49CD-B675-EF933178F3B3.jpeg
 
Victoria Riverside - 37/26/18/6 stories - Red Bank - City Centre

View attachment 65204

CSI PROP - Linkedin

Victoria Riverside, Manchester | Construction Update

Here are photos and updates from the site of Victoria Riverside in Manchester, latest update of December 2022.

According to updates from the developer (FEC UK): the concrete frames are progressing swiftly with Tower B close to completion. Tower A has reached level 11 and Tower C is at level 15.

Further key milestones have been reached across build this period, with the installation of the unitised façade commencing. The façade has now reached level 4 on Tower C and level 2 on Tower B, allowing for the scheduled internal fit-out to commence. The internal fit-out will include the creation of interior walls alongside elements of electrical, plumbing and mechanical engineering.

The construction schedule for 2023 forecasts completion of the concrete frames at Towers B & C, and the commencement of lift installation and fitting of the unitised façade to Tower A. Further progress on the internal apartment fit-outs can be made once the façade has been installed.

View attachment 65205

View attachment 65208

View attachment 65209
I parked my car round there for years. Absolute dump it was.
 
greegwolstenholme - Instagram

View attachment 64988
Surreal.
Looking like a Japanese city (and the big towers at DGS aren't even in that picture).

Victoria Riverside - 37/26/18/6 stories - Red Bank - City Centre

View attachment 65204

CSI PROP - Linkedin

Victoria Riverside, Manchester | Construction Update

Here are photos and updates from the site of Victoria Riverside in Manchester, latest update of December 2022.

According to updates from the developer (FEC UK): the concrete frames are progressing swiftly with Tower B close to completion. Tower A has reached level 11 and Tower C is at level 15.

Further key milestones have been reached across build this period, with the installation of the unitised façade commencing. The façade has now reached level 4 on Tower C and level 2 on Tower B, allowing for the scheduled internal fit-out to commence. The internal fit-out will include the creation of interior walls alongside elements of electrical, plumbing and mechanical engineering.

The construction schedule for 2023 forecasts completion of the concrete frames at Towers B & C, and the commencement of lift installation and fitting of the unitised façade to Tower A. Further progress on the internal apartment fit-outs can be made once the façade has been installed.

View attachment 65205

View attachment 65208

View attachment 65209
^^ Last pic - looks like a pic from the 1970's.
Despite all the incredible pace off construction much of central Manchester is still barren in parts.

Hello centralisation!
 
Student Castle/the Tumbstone - 55 Stories - Oxford Road Corridor

Manchester survives legal challenge over 55-storey ‘tombstone’​

07BF6733-C2F6-471E-8578-F9D78BD9EAC9.jpeg

A bid to overturn the city council’s decision to grant planning permission for GMS Parking’s controversial student skyscraper between Great Marlborough Street and Hulme Street has failed.
Manchester City Council’s planning committee approved GMS’ plans for the 55-storey, 853-bedroom development in June 2021. (At the time, Cllr William Jeavons dubbed the £130m project a “cheese grater-esque tombstone”.)

Some screen grabs from the planning application.

801270BB-A494-46AE-9A87-E6FFE80C614B.jpeg


1D32F662-175E-4460-8214-D9C773829156.jpeg
479668C3-1E5C-40B3-BEC4-9F6EE546A3E5.jpeg
 
Last edited:
AF2AD918-9613-47A8-8893-3D06E0C0CD73.jpeg

EAB67C5E-8760-49CE-816D-3ACC5DFE63AE.jpeg

62F1DBD1-0FB2-4532-B02A-D2DE6319CA3D.jpeg

51452EFD-9887-4383-88DD-E3DD54FD10AB.jpeg

B36466E7-5E35-422F-AA1D-FFB852F1414F.jpeg

 
Onenorthernman - Instagram

The towers on Great Jackson Street, including the Blade - 52 stories and Three60 - 52 stories, under construction. (seen from Pomona Island)

89AC9A4A-1F8E-4E97-B4B4-AF1FE6450C0F.jpeg

A great picture.

Renaker on-site - Trinity Island - 60/55 stories (foreground)

In the distance Factory International under construction.

Union Living tower 1 - 32 stories - St John’s/Enterprise City, under construction.

2nd crane close by.

Union Living tower 2 - 36 stories - St John’s/Enterprise City, under construction

Crane in the distance.


Eden office block - 15 stories - New Bailey


40112CC4-598A-4F67-9A05-A79A06E70916.jpeg
 
Domis Construction - Instagram

Salboy is Fred Done the Bookmaker. He also owns Domis Construction.

Victoria House - 25 stories - East Village

The building under construction behind it is the Castings - 25 stories.

8330EE80-57FF-4D92-98CD-0897B54E6BD1.jpeg

01C6B07C-63F8-4CF4-81A3-45696076A760.jpeg

6F7DBD4F-92B3-401A-9835-1CF5E7D26886.jpeg

The cleared site behind the Castings is for the Fairfax - 30/23 stories

4BA50775-1E8E-46BE-A61C-B4B3B1FE0460.jpeg

1DC71BAE-326F-4FF4-BC4B-627C3017FC2A.jpeg
 
Last edited:
View attachment 65374

View attachment 65375

View attachment 65379

View attachment 65376

View attachment 65377

Have to be frank here; that is one ugly structure.
 
Construction on the 477-apartment One Port Street is set to begin soon, with hoardings going up this week.

Renaker Build is the main contractor for Select Property’s Manchester project, which was designed by architect SimpsonHaugh. The construction cost for the scheme was listed as £126.5m in 2021, according to a viability statement by Lambert Smith Hampton. The same report listed the gross development value of the project as £154m.

One Port Street will be the flagship for Select’s newest residential brand, The Prestige Collection.

01DC41D9-9872-48D3-AFEF-7173DEE75465.jpeg

 