North Stand Construction Discussion

I’m guessing the 2 x cranes planted in the hotel will probably come down before end of year at this rate?
What do the experts think?
Think the tower cranes will remain until each wing is “water tight “ ie roof finished and all facades in placed and fully glazed and “sails “fitted so not by Xmas ☹️
 
All this joking about the north stand on wheels is inaccurate, in fact the whole Etihad stadium is on wheels and will be pushed to meet up with the north stand
 
These tripody supports but with four legs instead, on top of the towers that will hold the new roof and cables up, and have the rooftop walk and platforms between them. More of a descriptive than a technical term, really.

View attachment 135330

With the big screen on the front face of the hotel does that not mean there will be quite a few rooms without a window?

Also is the rake of the new terrace steeper than the existing L2? Looks like it from that image and would be much better if so.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.