supercity88
Well-Known Member
- Joined
- 9 Aug 2009
- Messages
- 13,841
Great find. It is such a common thing, that I quite often wonder why a condition like that is even noted as pre-commencement rather than pre-installation, by default.
That aside, the programme included for the installation of the mock-up is by Sisk, so they may be more advanced with them than we all think.
It is still including a broader commencement date of late October, so there doesn't seem to be much of a planned shift as of yet. The facade mock-up would be ready on site around April, so that will be the time to look at it, so will hold off comments on it just now.
edit, the 'mock-up' on there is just the extents, presumably to agree the size of the real life one that will be installed for inspection. Rather than to approve it off the back of that.
That NMA has been approved now, so we'll probably see an application to discharge the re-worded condition fairly soon hopefully giving some images/brochures to support the panels.