North Stand Construction Discussion

Still can’t get my around that no more terracing is being put into those open ends left and right of the stand. The raker beams are in place and sure it must be done before the roof supports go in.
 
Apparently, going to open next January, according to Danny Wilson. I thought the plan was to have it open for the start of next season? And rumours that they're 10 weeks behind schedule?
 
Apparently, going to open next January, according to Danny Wilson. I thought the plan was to have it open for the start of next season? And rumours that they're 10 weeks behind schedule?
The plan for many months has been for the expanded North Stand to open between Dec 25 and Jan 26. The current roof works are the most critical tasks affecting the critical path. That’s why Danny Wilson has been saying for months that that the Club will engage with fans on tickets / prices in the new stand when this work is completed because this is the biggest risk to the opening date changing.

There have been rumours they some seats will be available from early next season but this has always looked ambitious.
 
Man City give major North Stand update with fresh timeframe for opening
https://www.manchestereveningnews.c...city-give-major-north-31120663?utm_source=app
"City have previously said that the new stand will open during the 2025/26 season, but have now given a narrower timeline. Speaking to fans at an event last week, the club's head of operations Danny Wilson said via the Forever Blue podcast that it will be ready to open by January 2026 as long as everything continues to go to plan."
 
No it is 400 bedrooms. Not beds. 401 if we are being exact, but everyone rounds down for ease.
The covering letter to the plans put before MCC states:

The expansion of the Etihad Stadium North Stand to provide an additional net capacity of 7,910 and an increase in the overall stadium capacity of up to 61,958 (noting that this capacity figure is within the ambit of an extant Planning Permission for expansion of the Stadium, including its north stand, which was granted in 2014).
• Associated hospitality and concourse facilities and an ancillary TV Studio.
• Creation of a roof walk attraction comprising walkways and platforms on the roof of the Etihad Stadium North Stand. • A nine-storey, 391-bed hotel, with a restaurant at Level 1 and a further 10 suites within the proposed expanded North Stand which are flexible for use as hotel or hospitality space.

• A further eight storey-building comprising:
• A new club shop and ticket office at Ground Floor and First Floor;
• A museum at Level 2 which links directly into the proposed North Stand;
• An interactive visitor experience venue at Level 3; and,
• 4,000 sq. m. of workspace at Levels 4, 5, 6 and 7.

• City Square, a significant new covered outdoor fan zone and flexible event space located between the proposed hotel and the further eight-storey building, with year-round food and beverage (F&B) facilities provided at the ground and first floor of the proposed North Stand and interrelated adjoining buildings;
• A new site vehicular access route and drop-off point, which will be provided to service the Proposed Development via an existing junction with Alan Turing Way;
• Creation of new public realm, including the creation of a mix of both hard and soft landscaping, including places to sit and dwell alongside planters and trees; and
• Other associated works, including the creation of a tree lined access road from Alan Turing Way, and a pick-up and drop-off area northeast of the hotel.
 
The plan for many months has been for the expanded North Stand to open between Dec 25 and Jan 26. The current roof works are the most critical tasks affecting the critical path. That’s why Danny Wilson has been saying for months that that the Club will engage with fans on tickets / prices in the new stand when this work is completed because this is the biggest risk to the opening date changing.

There have been rumours they some seats will be available from early next season but this has always looked ambitious.

Wouldn’t be too concerned with the roof works - barring a disaster.

The new roof has to be on and the old roof removed at least a month before the first home home. There’s no other time it could realistically be done.

Once the first roof beams go up, it will only take a couple of months for them all to be up.

IMG_6461.jpeg
IMG_6512.jpeg
 
Snippet on the stand opening at the start of the podcast, along with future possible season ticket info, etc,

 
The covering letter to the plans put before MCC states:

The expansion of the Etihad Stadium North Stand to provide an additional net capacity of 7,910 and an increase in the overall stadium capacity of up to 61,958 (noting that this capacity figure is within the ambit of an extant Planning Permission for expansion of the Stadium, including its north stand, which was granted in 2014).
• Associated hospitality and concourse facilities and an ancillary TV Studio.
• Creation of a roof walk attraction comprising walkways and platforms on the roof of the Etihad Stadium North Stand. • A nine-storey, 391-bed hotel, with a restaurant at Level 1 and a further 10 suites within the proposed expanded North Stand which are flexible for use as hotel or hospitality space.

• A further eight storey-building comprising:
• A new club shop and ticket office at Ground Floor and First Floor;
• A museum at Level 2 which links directly into the proposed North Stand;
• An interactive visitor experience venue at Level 3; and,
• 4,000 sq. m. of workspace at Levels 4, 5, 6 and 7.

• City Square, a significant new covered outdoor fan zone and flexible event space located between the proposed hotel and the further eight-storey building, with year-round food and beverage (F&B) facilities provided at the ground and first floor of the proposed North Stand and interrelated adjoining buildings;
• A new site vehicular access route and drop-off point, which will be provided to service the Proposed Development via an existing junction with Alan Turing Way;
• Creation of new public realm, including the creation of a mix of both hard and soft landscaping, including places to sit and dwell alongside planters and trees; and
• Other associated works, including the creation of a tree lined access road from Alan Turing Way, and a pick-up and drop-off area northeast of the hotel.

It is 401 bedrooms. 'Bed' is not terminology that anyone in the industry uses to actually mean a person or singular bed. Not in this country at least.

Here is the full room schedule if interested, per floor. 'Guestroom' being the more appropriate term in that particular one.

1000034869.jpg
 
Apparently, going to open next January, according to Danny Wilson. I thought the plan was to have it open for the start of next season? And rumours that they're 10 weeks behind schedule?
It was always the end of this year, publicly. Which in reality means January if avoiding the festive time.

The start of the season is a rumour that is doing the rounds, amongst people closer to it. I am not dismissing it btw, I find both the posters and the claim believable. But publicly they arent really 'behind'.
 
Last edited:
It is 401 bedrooms. 'Bed' is not terminology that anyone in the industry uses to actually mean a person or singular bed. Not in this country at least.

Here is the full room schedule if interested, per floor. 'Guestroom' being the more appropriate term in that particular one.

View attachment 148610
Thank you. The planning documents were incorrect then. My post was copied from the covering letter accompanying the planning app.

I frequently hear hotels described as in terms of no. of beds.
 