North Stand Construction Discussion

Today’s season ticket price increase.

Will be interesting to see what season ticket prices will be in NSL2 in ‘3 years time’. Possibly another 3 season ticket prices rises before then. Or maybe not. As a rule L2 season tickets are always more expensive than L1 season tickets.

Just over 2 years.
 
I get the impression that you haven’t read pretty much any of the points that have been made.

Pretty much every poster is happy with the expansion and what’s being planned. It’s just the 600 odd corporate seats at the front of a home end that a large number of posters don’t agree with

Apparently you’re spoilt if you don’t agree with that? That is a joke of a comment.
And I get the impression you might be a Cockwomble .
 
If it‘s on schedule? Coop Live Arena, etc, supply chain issues and prices increases across the board, etc. Give it a bit longer. ;-)

Doesn’t take 3 years to add a new tier/extend a current tier. You can build an entire stadium in that time. Usually an 18 month job including groundworks.

They’re actually starting it early when compared to the South Stand - October 2023 with a finish for August 2025 so they have plenty of time. South Stand was February 2014 for groundworks with construction starting in July/August 2014. The stand was open for August 2015.

The hotel doesn’t start construction until August 2024 and won’t be finished for 2 years after that so we won’t be waiting for that to be completed before the stand is opened or anything.
 
Doesn’t take 3 years to add a new tier/extend a current tier. You can build an entire stadium in that time. Usually an 18 month job including groundworks.

They’re actually starting it early when compared to the South Stand - October 2023 with a finish for August 2025 so they have plenty of time. South Stand was February 2014 for groundworks with construction starting in July/August 2014. The stand was open for August 2015.

The hotel doesn’t start construction until August 2024 and won’t be finished for 2 years after that so we won’t be waiting for that to be completed before the stand is opened or anything.

Point taken, but it’s not just a tier, the hotel aside.

The stand, including the expanded tier, and the fan plaza will stretch all the way back to the back of the current souvenir store. The South stand was a few metres back ( in comparison) with an additional tier.

78BE1164-9C22-4490-B852-3FAE14A4CEE9.jpeg

A61A612F-1F0F-4248-8818-0E24B16A1A07.jpeg

Not going to dwell on it. Looking forward to the build, regardless of how long it takes.
 
Last edited:
People will get a similar but better view of the city centre skyline from the platforms on the roof walk corners.

These pictures were taken from the top of the CBS spiral before the players coach arrived on Wednesday.

Current towers under construction and finished and new towers under construction will be visible on the city centre skyline in 2 to 3 years time when the North stand expansion is completed.

PXL-20230426-173231804-MP-2.jpg


PXL-20230426-173309489-MP-2.jpg


PXL-20230426-173329015-MP-2.jpg


PXL-20230426-173820204-MP-2.jpg
 
Some expected it to look like a 7 star in Abu Dhabi ;-)
To paraphrase Basil Fawlty, what do you expect a hotel at a football stadium in East Manchester to look like?

The Sydney Opera House perhaps?

The Hanging Gardens of Babylon?

Herds of Wilderbeest sweeping majestically across the plain?
 
Does anyone know if the work will disrupt people currently sat in level 2 NS. Will the new bit just get added to the back of the old bit or is the whole stand being replaced?
 
Does anyone know if the work will disrupt people currently sat in level 2 NS. Will the new bit just get added to the back of the old bit or is the whole stand being replaced?

Added to the current tier according to the design document. The back row of SSL2 was temporarily lost during construction of SSL3 though so it’s a possibility that could happen with NSL2 during this new construction.
 
Point taken, but it’s not just a tier, the hotel aside.

The stand, including the expanded tier, and the fan plaza will stretch all the way back to the back of the current souvenir store. The South stand was a few metres back ( in comparison) with an additional tier.

View attachment 77014

View attachment 77013

Not going to dwell on it. Looking forward to the build, regardless of how long it takes.

The stand will be open and accessible before City Square and any other attachment is completed.
 

Don't have an account? Register now and see fewer ads!

SIGN UP
Back
Top
  AdBlock Detected
Bluemoon relies on advertising to pay our hosting fees. Please support the site by disabling your ad blocking software to help keep the forum sustainable. Thanks.