I remember driving past every day as they started clearing the land and building the stadium for the games. Look at us now. Absolutely unbelievable. And the team aint too bad either.I walked past the building work on Friday for the youth cup final, the sheer scale of the works is amazing
Beheadings on the centre circle I'd imagine.Just wait until there is a delay or the hotel presidential suite toilets are leaking!!
The towers look near ready for the cable transfer. Would be good to get some footage of it happening. Guessing it will be before the end of the month - hopefully!
Will the North stand be closed ir reduced capacity next season? Assume the upper tier will be closed
The towers look near ready for the cable transfer. Would be good to get some footage of it happening. Guessing it will be before the end of the month - hopefully!
I still can't see where the new cables are going, it can't be under the existing ones as they'd never get the stanchion out I'd have thought. So if over the top then the three plates on each tower would look most likely that follow the curve of the new roof? Given they're "only" supporting their share of the load from the E & W roofs and the cable net itself I'm watching with great interest.The towers look near ready for the cable transfer. Would be good to get some footage of it happening. Guessing it will be before the end of the month - hopefully!
I still can't see where the new cables are going, it can't be under the existing ones as they'd never get the stanchion out I'd have thought. So if over the top then the three plates on each tower would look most likely that follow the curve of the new roof? Given they're "only" supporting their share of the load from the E & W roofs and the cable net itself I'm watching with great interest.
Is the NS new roof likely to be in position and the old one removed during pre season or do they need more time for that?