North Stand Construction Discussion

I spoke to a steward about it a few weeks ago and he looked at me as if I had two heads. Thanks for the email address though, I will follow up on that.
Not surprised, there are some good stewards but their only option is to raise at the de-brief then it gets lost If you want to take it further Manchester City Council would be the option Although I couldn't find a contact the page below is pretty useless
Contacts at the club

Director of Commercial and Fan Support
Jonathan Lingham
Facilities Director
Clive Wilton
Head of Safety and Security
Luke McDonnell
Chief Communications Officer
Simon Heggie
Head of Fan Support
Fran Warburton

Normally emails are the the format Luke.mcdonnell@mancity.com

If you are Linkedin you could try
 
Last edited:
Apologies if this has already been posted, but the lack of organisation around the crowd flow in the area directly by the construction site, and opposite the tram exit is an accident waiting to happen.

Before the game there was a line of ineffective stewards milling around, but people from both directions rushing to get past. Common sense would have been for the stewards to direct the crowds to different sides of the pathway depending on which direction they were going. Instead of letting them meet head on and cause a crush, as was happening.

Even worse that afternoon the game the same stretch had no presence from any stewards, it was dark, the path was full of puddles people were walking round to avoid and with no directions for the crowds it ended up one big sea of people.

These issues have been there all season, but last night was the worst I've seen it. Hopefully no one got hurt.
Spot on the crowd flow is not organised at all. The state of the area around the stadium is a disgrace huge puddles everywhere, it is worse when it is so dark.
 
PXL-20241123-163813176-MP.jpg


PXL-20241123-163831707-MP.jpg


PXL-20241123-163938560-MP.jpg
Noted the Etihad Stadium & City crest weren’t lit up last night on the SS, needs sorting.
 
Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.
I'm assuming that this will be a bridge of some that will be supported by the towers and hotel structure. There are no further supports to be added between the two as it will remain a through walkway.
 
Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.

I have highlighted this before to someone else, let's see if I can find it again.

They have only got to that level in the last week btw, and the connection is yet to be built.
 
Looking at the plans, drone videos and photos one thing I can’t picture from what’s already assembled is how the hotel connects to the back of the stand towers.
The buildings will be connected part way up to the towers so that there is a tunnel for people to pass through City Square without needing to walk all the way around.

IMG_6548.jpeg
IMG_6553.png
IMG_1949.jpeg

May be wrong but could see steel works starting at the towers and built across to the structure of the buildings. The exterior will match the design of the buildings so it all blends together.
 
Last edited: